1 |
OPS |
JTA.OPS 2.002: Certification phase 2: Formal Application Phase(Gate 2) |
|
12/02/2014 |
2 |
OPS |
JTA.OPS 2.003: Certification Phase 3: Document Compliance Phase |
|
12/02/2014 |
3 |
OPS |
JTA.OPS 2.004: Certification Phase 4: Demonstration and Inspection phase(Gate 3) |
|
12/02/2014 |
4 |
OPS |
JTA.OPS 2.005: Certification Phase 5 |
|
12/02/2014 |
5 |
OPS |
JTA.OPS 2.008: Evaluate an Air Operator Compliance Statement |
|
12/02/2014 |
6 |
OPS |
JTA.OPS 2.009: Evaluate a General Operations Manual (Operations Manual part A) |
|
12/02/2014 |
7 |
OPS |
JTA.OPS 2.010: Approve a Flight Crew Training Program |
|
24/02/2014 |
8 |
OPS |
JTA.OPS 2.001: Certification Phase 1: Pre-Application Phase. (Gate 1) |
|
06/03/2014 |
9 |
OPS |
JTA.OPS 2.014: Approve an Operator's Exit Row Seating Program |
|
01/04/2014 |
10 |
OPS |
DSA.AOC.MAN.003 Minimum Equipement List Policy and Procedures Manual |
|
17/03/2015 |
11 |
OPS |
DSA.COA.PRO.0112 relative à l approbation des contrats de location d aéronef |
|
04/02/2021 |
12 |
OPS |
DSA.AIR.COA.0114 Notification of occurences to organisations responsible for type design |
|
14/07/2021 |